• sheogorath@lemmy.world
    link
    fedilink
    arrow-up
    0
    ·
    5 months ago

    All the projects that have shittier outcomes in my experience is always waterfall. This is mainly because the stakeholders usually have this bright idea to be added in the middle of development that’s really need to be added at all costs and then got angry when the timeline got pushed because of their fucking request breaking a lot of shit.

    At least scrum has a lead time of around 2 weeks so that when someone has a idea we can tell them we’ll add it to the backlog and hope they forgot about it during the next sprint planning.

    • balp@lemmy.world
      link
      fedilink
      arrow-up
      0
      ·
      5 months ago

      I’m sure, doth the Astrumants should survive the landing, there should be a way to return, and they need a shitter as part of the missed requirements. As it’s a waterfall, that will come in the second, third, and fourth trips.