I am using unattended-upgrades across multiple servers. I would like package updates to be rolled out gradually, either randomly or to a subset of test/staging machines first. Is there a way to do that for APT on Ubuntu?
An obvious option is to set some machines to update on Monday and the others to update on Wednesday, but that only gives me only weekly updates…
The goal of course is to avoid a Crowdstrike-like situation on my Ubuntu machines.
edit: For example. An updated openssh-server comes out. One fifth of the machines updates that day, another fifth updates the next day, and the rest updates 3 days later.
Ubuntu only does security updates, no? So that seems like a bad idea.
If you still want to do that, I guess you’d probably need to run your own package mirror, update that on Monday, and then point all the machines to use that in the sources.list and run unattended-upgrades on different days of the week.
No, why do you think that?
I think you might be on to something here. I could probably do this with a package mirror, updating it daily and rotating the
staging
,production
, etc URLs to serve content as old as I want. This would require a bit of scripting but seems very configurable.Thanks for the idea! Can’t believe I didn’t think of that. It seems so obvious now, I wonder if someone already made it.
Removed by mod
Go away. You’re here pretending that Ubuntu only does security updates. You have never received a bugfix from Ubuntu? And I am the one who doesn’t know what he’s talking about?
Why do you insert yourself into conversations with other people? I am the one who’s rude?
Yeah no the other poster is correct, I meant Ubuntu doesn’t do feature updates after release. You seem worried about something that’s quite unlikely to happen (breakage introduced from minimal patches), while delaying security fixes. And I assume the vast majority of updates are security fixes.
And I also think you’re being rude in this whole thread.
Sure, bugfix and security.
I’m sorry but I got a lot of very dumb answers like “have a staging environment” and “use a schedule”, even though I listed both this points in my (very short) post already. The most detailed answer I got is a playbook copy/pasted from an LLM, and this one dude was getting into all subthreads to tell me I don’t understand what I’m asking until I blocked him. So you don’t have to worry about me, this was probably my first and last thread on Lemmy ;-) Either way, apologies if I got heated up.
Removed by mod